Taylors Projects

Delivering high-quality infrastructure solutions

Taylors Contracting undertakes a wide range of projects in the top of the South Island and lower North Island. Our mission is to deliver high-quality infrastructure solutions that work for people and the environment.

Harvest Tracking Hira Forest

Forestry Services Snapshot 2023-2024

Screenshot 2024-09-20 at 2.36.29 PM

Labyrinth Weir

Screenshot 2024-09-20 at 2.32.48 PM

Waimea Community Dam 2024

Screenshot 2024-09-20 at 2.27.18 PM

Upper Motueka Flood Recovery

Screenshot 2024-09-20 at 2.15.26 PM

Blairich Irrigation Reservoir

Upper Condors Stopbank project

Stopbanks – repairing and enhancing community infrastructure

Pictured at Port Tarakohe from left to right are: Alan Brunning (Sollys), Kevin ‘Skin’ Bruning, Neil McKay, Wayne ‘Swassie’ Schwass, Ben Burbidge, Mick Fenemore, Kerry ‘Butch’ Schofield and Rob Cumming.

Rock Export to Lower North Island

Cullen Pt, Marlborough

Cullen Point work supports infrastructure resilience in Marlborough

Donald-Creek-1

Donald Creek Paired Catchment Study

Kate Valley Landfill and Energy Park

Kate Valley Landfill and Energy Park (Phase 2)

Before

Branch River Infiltration Gallery

Dam-Concrete

Waimea Community Dam

Challies-Bridge

Challies Island Bridge

IMG_0667

Motueka Stopbank Refurbishment

TimCuff-TePaHarakekeOpens50-copy

Te Pā Harakeke

Nelson Tasman Flood Response 2022

Nelson Tasman Flood Response

Taylors-Contracting-Seafield-Terrace-Revetment-Works-5

Seafield Terrace Rock Revetment Works

Pigeon-Valley-Fire-IMG_5249-1

Pigeon Valley Fire

20170515_123940

Tasman Rivers Maintenance Contract

IMG_5381

Gollans Bay Quarry Road

To find out more about the work that Taylors Contracting does or to connect with one of our Department Managers please contact us.